1 result for (book:tes5 AND session:200 AND stemmed:build)

TES5 Session 200 October 20, 1965 4/113 (4%) olive Rico Puerto car cafeteria
– The Early Sessions: Book 5 of The Seth Material
– © 2013 Laurel Davies-Butts
– Session 200 October 20, 1965 9 PM Wednesday as Scheduled

[... 21 paragraphs ...]

The separate building of apartments represented possibilities in the more distant future. Ruburt is not ready for them yet. The one room into which he looked for example was not vacant, or ready for him in other words. The ability represented by the jacket however represents the fairly immediate future.

[... 7 paragraphs ...]

It is close to water, and further west, and in a different town or location. (Pause.) It is to the rear rather than the front of the building, to the side and rear. With a tree immediately outside the window; a bushy sort of tree with something like spikes on it. (Pause.)

[... 2 paragraphs ...]

They ate at a place with wide windows and blinds, closed because of the sun. One extremely long window at the front, the entire length of the building, covered with this blind.

[... 2 paragraphs ...]

The sister’s husband has a squat build, and uses his hands often in work.

[... 76 paragraphs ...]

Similar sessions

TES5 Session 218 December 15, 1965 Priestley Peggy Dunne San seminar
TES5 Session 203 October 28, 1965 Peg Rhine Rico Puerto Duke
TSM Chapter Seven cab motel Peg tests Rico
TES5 Session 199 October 18, 1965 appointment Colucci Jersey radio sneezing