1 result for (book:deavf2 AND session:941 AND stemmed:plant)

DEaVF2 Chapter 12: Session 941, February 8, 1982 2/66 (3%) nuclear Iran tmi reactor Russia
– Dreams, "Evolution", and Value Fulfillment: Volume Two
– © 2012 Laurel Davies-Butts
– Chapter 12: Life Clouds
– Session 941, February 8, 1982 9:01 P.M. Monday

[... 31 paragraphs ...]

I last discussed the cleanup at Three Mile Island, and nuclear power challenges in general, including safety and costs, in the opening notes for the 936th session, with its Note 2. That was almost three months ago, in November 1981; see Chapter 11. Lesser accidents, or “events,” as they are called within the nuclear-power industry, have continued to happen within the context of that primary accident at TMI—the loss of coolant for the nuclear reactor of Unit No. 2. I call the whole series of accidents “events of consciousness,” and think of them as unfolding in an orderly way from that initial large-scale event of consciousness, which took place on March 28, 1979. Early in January of this year (1982), for example, decontamination workers in a pair of buildings located between the plant’s two reactors triggered alarms when they inadvertently blew radioactive dust into the buildings from a drain filled with contaminated particles. The “unusual event” was not serious, although a small amount of radiation was released into the atmosphere through a ventilating system.

[... 1 paragraph ...]

In Note 2 for the 936th session, I also described how the NRC had asked the operators of certain nuclear power plants to check for cracks in the vessel walls of their pressurized-water reactors, which are the kind installed at TMI. Now problems with corrosion are being announced. The reactor for Unit No. 1 at TMI is undamaged; it had been shut down for maintenance and refueling at the time of the accident to its twin, nearly three years ago, and a series of delays has kept it idle ever since. In February, again, company officials revealed the discovery of extensive corrosion in the bundles of small-diameter tubes in the two steam generators powered by Unit No. 1, which will delay any restarting of the unit for another six months to a year. The tubes circulate hot radioactive water from the reactor throughout the steam generators. Replacement of at least several thousand such tubes will cost millions of dollars; if engineers simply plug the damaged tubes, the reactor will operate well below capacity. (Steam generators at some other plants have a new problem: the accumulation of a corrosive sludge at their bases.)

[... 31 paragraphs ...]

Similar sessions

DEaVF2 Chapter 11: Session 936, November 17, 1981 conserving Iran Iraq Moslem nostalgia
DEaVF1 Preface by Seth: Private Session, September 13, 1979 Iran animals Mitzi religious Mass
DEaVF2 Chapter 10: Session 933, August 7, 1981 Bahais pleasure tribe dreamers Shiite
DEaVF2 Chapter 8: Session 918, June 2, 1980 nuclear intervals venting mathematical passageways