1 result for (book:deavf2 AND session:941 AND stemmed:current)

DEaVF2 Chapter 12: Session 941, February 8, 1982 1/66 (2%) nuclear Iran tmi reactor Russia
– Dreams, "Evolution", and Value Fulfillment: Volume Two
– © 2012 Laurel Davies-Butts
– Chapter 12: Life Clouds
– Session 941, February 8, 1982 9:01 P.M. Monday

[... 35 paragraphs ...]

Company projections are that the entire cleanup at TMI won’t be completed until the end of 1988—more than nine years after the accident took place. Current plans are that once the radioactive water is drained from the containment building of Unit No. 2, engineers will conduct remote investigations of the core of the reactor itself. A specially designed video camera will be inserted into the core so that the actual damage to the pencil-thin fuel rods can be assessed; and hundreds of thousands of sonar readings, taken through openings already present in the reactor, will be assembled by computer into images of the core. Several major steps must follow, all of them on an enormous scale: the lifting of the 160-ton metal “head,” or cap, of the reactor; the removal of the upper plenum assembly, the 55-ton mechanism which makes possible the raising and lowering of fuel control rods into the 100-ton reactor core, thus regulating the intensity of its nuclear reactions; and eventually, the difficult piece-by-piece removal of the damaged core itself. Even then, the core will still be so radioactive that most of the work will have to be done by remote-controlled devices. Finally, the cavernous containment building itself will be cleaned, again by remote control.

[... 29 paragraphs ...]

Similar sessions

DEaVF2 Chapter 11: Session 936, November 17, 1981 conserving Iran Iraq Moslem nostalgia
DEaVF1 Preface by Seth: Private Session, September 13, 1979 Iran animals Mitzi religious Mass
DEaVF2 Chapter 10: Session 933, August 7, 1981 Bahais pleasure tribe dreamers Shiite
DEaVF2 Chapter 8: Session 918, June 2, 1980 nuclear intervals venting mathematical passageways