1 result for (book:deavf2 AND session:918 AND stemmed:build)

DEaVF2 Chapter 8: Session 918, June 2, 1980 3/32 (9%) nuclear intervals venting mathematical passageways
– Dreams, "Evolution", and Value Fulfillment: Volume Two
– © 2012 Laurel Davies-Butts
– Chapter 8: When You Are Who You Are. The Worlds of Imagination and Reason, and the Implied Universe
– Session 918, June 2, 1980 9:15 P.M. Monday

(In Chapter 5 of Dreams, in Volume 1, see Note 2 for the 899th session, of February 6, 1980. I wrote that in April engineers were scheduled to enter the contaminated containment building housing the damaged reactor [Unit No. 2] at the Three Mile Island nuclear power generating plant in southeastern Pennsylvania. The engineers were to gather radiological data to be used in decontaminating the crippled facility. To insure the safety of all workers, however, the plan is that over a period of several weeks a large quantity of radioactive krypton gas must first be vented into the atmosphere from the containment building. This proposed venting is still arousing much strong opposition.1

[... 23 paragraphs ...]

The planned April (1980) entry into the containment building was postponed until May for several other reasons, however. One was a lack of federal certification of the breathing equipment engineers will have to wear inside the building. Indeed, that first entry still hasn’t been made. It’s been rescheduled again—this time for late July, upon completion of the venting, and 16 months after the near-meltdown of radioactive fuel in the reactor’s core.

Following the accident at TMI, and aside from the great fears “generated” by it, a host of problems began accumulating for the nuclear power industry—involving everything from poor plant design (as Seth commented in the 914th session for Chapter 7 of Dreams), to enormous cost overruns and the fear of default on bond issues, shoddy construction and quality control, human and mechanical error, the disposal of radioactive waste, conflicts with antinuclear and environmental groups, arguments over evacuation plans at various nuclear-plant sites, a greatly expanded list of steps (numbering in the thousands) that the NRC is compiling for utilities to take in order to increase the safety of their plants, and even governmental concern over the possible manipulation and falsification of plant safety records. The last nuclear plant was ordered in 1978. So far this year our country’s consumption of electricity has increased less than 2 percent, and it is now expected to actually decrease next year. Unheard of, in view of all of those predictions that we must continue to build nuclear power generating plants to meet projected demands!

[... 5 paragraphs ...]

Similar sessions

TPS7 Deleted Session June 5, 1982 finger darker powder calindula Hal
DEaVF2 Chapter 8: Session 917, May 21, 1980 imagination eccentricity disorders insane stockpile
NoME Part Three: Chapter 6: Session 845, April 2, 1979 nuclear Mile Jonestown Island scientists
NoME Part Three: Chapter 6: Session 844, April 1, 1979 nuclear Harrisburg Island Mile smarter